For contractors, developers & PMs

Construction Drone Services

Aerial view of a building under construction with a tower crane
Overhead view of a building frame on a cleared lot
Overhead view of graded earthworks with plant and haul roads
Aerial view of a commercial development site beside a highway
What do you need?
Where's the site?

Free to post · Usually a reply the same day

Flying several sites every month?Get rates agreed up front and a backup pilot.Talk to us

234 construction pilots listed · Pay the pilot directly, no commission

Independent FAA Part 107 pilots who cover your area quote and fly the job.

Most common
Monthly flights
Matches reporting and payment cycles.
Volumes
From the same flight
Cut and fill against a design or a prior survey.
Accuracy
Set by control
Ground control or an RTK aircraft brings it into survey territory.
Live site
Induction & slots
Planned around lifts, pours and the crane's slew radius.

Recurring flights beat one-off visits

A single set of aerials is a marketing asset. A monthly set flown to the same plan is a project record, and it is worth much more for only a little more money — the pilot's travel and setup are already paid for, so the marginal cost of the next visit is low. If you want a series, say so when you post and ask for the run to be priced as a package. Agree the flight plan and the altitude on the first visit so every later set is comparable, and agree where the files live: a series is only useful if the project team can find month four when they are arguing about month two.

Which construction service you need
Progress photosThe same views every visit, as a time seriesConstruction progress photos
Stockpile and earthworks volumesVolume per pile; cut and fill against a designStockpile volume measurement
Site surveyTerrain model, contours, cross-sectionsConstruction site survey
OrthomosaicA current, measurable map of the whole siteMapping and surveying

What accuracy actually means here

Photogrammetry from a standard drone gives good relative accuracy and vaguer absolute accuracy — measurements within the model line up with each other better than they line up with the real-world coordinate system. Adding surveyed ground control points, or flying an aircraft with RTK positioning, is what brings absolute accuracy into survey territory, and both add cost. If a number is going into a payment application or a dispute, say so up front and ask the pilot to state the achievable tolerance and their method in the quote rather than assuming it.

Working around a live site

The flying is the easy part; the site is not. Expect to sort out induction, PPE, a launch and recovery area clear of the crane's slew, timing that avoids lifts and concrete pours, and notification to anyone whose airspace overlaps yours. If the site sits under controlled airspace, an FAA authorisation is needed before flight and that has a lead time. Give the pilot the site address and the constraints when you post and these turn into scheduling notes rather than surprises on the day.

What a programme delivers

  • A monthly set flown to the same plan — a project record rather than a marketing asset, for only a little more money.
  • Good relative accuracy from standard photogrammetry, adequate for progress and volumes.
  • Absolute accuracy in survey territory once ground control or an RTK aircraft is added.
  • A fixed flight plan and altitude from the first visit, so every later set is comparable.

What costs more than people expect

  • Put a number into a payment application safely without a stated tolerance and method. Say so up front and ask for both in the quote.
  • Skip site logistics: induction, PPE, a launch area clear of the crane's slew, and timing around lifts and pours.
  • Fly under controlled airspace without an FAA authorisation, which has a lead time.
  • Be useful if nobody can find month four when they are arguing about month two. Agree where the files live.

The pilot's travel and setup are already paid for, so the marginal cost of the next visit is low. Ask for the run to be priced as a package.

What to expect

Progress documentation

The same flight path flown every month produces a comparable series rather than a pile of photos. That series is what settles a delay argument, backs a payment application, or shows a lender where the money went.

Volumes and quantities

Photogrammetry measures stockpiles and cut and fill without anyone climbing them. Accuracy depends on ground control and flight planning, so ask what tolerance a pilot will commit to before you rely on the number commercially.

Site-wide orthomosaics

A stitched, scaled overhead of the whole site that drops into your design software and lines up with the drawings — useful for coordination, logistics planning and as-built comparison.

Construction pilots with published profiles

Real published profiles. Open any one to see credentials, kit, service area and sample work before you post.

How it works

Three steps, and the first one is free

  1. Describe the job

    The questions adapt to the work: area for a mapping job, access and asset for an inspection.

  2. A pilot near you sends a price

    Pilots whose service area and services match are emailed. Usually a reply the same day, from a pilot or from our team.

  3. Book them and pay them directly

    Check their certificate, kit and sample work, then pay the pilot. SkyLog takes no cut and adds no markup.

For teams with recurring work

Drone work every month? Let us run it.

SkyLog Managed books your visits with pilots we've lined up for your sites, at rates agreed up front.

  • Rates agreed up front
  • A backup pilot
  • Recurring visits

Before you post

How often should we fly a site?

Monthly is the most common cadence because it matches payment cycles and reporting. Fast-moving earthworks sometimes justify fortnightly; a long fit-out phase where nothing changes outside rarely does.

Can drone volumes be used for payment?

They frequently are, but only when the method supports it. Ask the pilot how they establish scale and what accuracy they will commit to in writing, and check whether your contract or your surveyor requires a particular method.

Will the output work with our design software?

Ask for the formats you need by name — point cloud, mesh, GeoTIFF orthomosaic, DXF contours — and confirm the coordinate system. Getting the coordinate system wrong is the single most common reason a good survey lands in the wrong place on a drawing.

Do we need to tell neighbours or workers?

Your own site rules will usually say. Practically, telling the site team when a flight is happening avoids the aircraft becoming a distraction, and telling neighbours avoids the complaint that follows an unexplained drone over a boundary.

Are the pilots insured?

Ask, and ask for the certificate rather than an assurance. Most sites require a specific liability limit before anyone is allowed to work, and pilots who do construction work regularly are used to producing the paperwork.

From a job poster

The jobs nobody else would quote

“I was not expecting to have a response so quickly after calling countless different companies.”
Jared OlroydOwner, Specialty Cleaning Agents
Quote in under 2 hours

Post your site free

Describe the site and the cadence you need, and let construction drone pilots quote the run. No commission, no obligation to hire.

Aerial view of a building under construction with a tower crane